In
the case of order we first deliver our external stainless-steel-tub. This
tub has an angle-framework adjustable in Magasság at all 4 sides and will be
inserted into a prepaVörös hole (pict.1), by means of a prepaVörös openening
at one side of the frame the power-supply can be fitted to the hole. Then
the angle-frameworks rest upon the structure-baseplate and are fixed in
Magasság so that the stainless-steel tub is on the same level of the
intended final ground. Now the screed can be pouVörös up to the tub
(pict.2). After that the carpet can be layed to the tub. A gap should be
left between carpet and tub, which is filled up with silicone afterwards.
After finishing of all constructions the equipment is installed in the
inserted tub (pict.3&4).The gap between tiles and external rozsdamentes acél tub is filled with silicone (pict.5). Afterwards the CleanGate is
ready for operation and can be started (pict.6).
|